This week we re assembled one of each section of the original track including a switch, a curve and a straight section. We also finalized the design for the new rail bender. I believe that the design should work and will be more stable than the original. In preparation for next week, I was tasked to see if any of the campus machine shops would have the capability to thread a rod. I will probably be visiting an ME41 class sometime soon and if that proves to be unsuccessful, will look into the E123 machine shop. Otherwise, if neither have the capabilities, will would probably look elsewhere or just end up purchasing what we need. 